Project name | : Total Refinery |
Location | : Balikpapan to Senipah |
Country | : Indonesia |
Operation Period |
: 15th February 2004 to 15th March 2004 |
Cargoes to be transported | : - 2 units Turbocompressor + 20 Tons baseframe
(Dim : 27.00 x 7.90 x 17.00 – 270 Tons + 20 Tons) |
Equipment Supply | :
- 1 unit 18 (1+ ½) Axle lines Goldhofer PST/THP trailer
- Total 27 Axle lines Goldhofer PST/THP trailer
- 4 unit 150 Tons Jack
10 pcs Supports (Dim: 5.00x1.20x0.30m each)
- Ro-ro equipments consist of:-
5 pcs Ro-ro ramp (Dim: 12x1.50x0.30m each)
5 pcs Steel wedge (Dim: 2.50x1.50x0.30m each)
6 pcs Wedge (Dim: 3.00x1.50x0.30m each)
2 pcs Coupling beam (Dim: 4.50x0.3x0.3m each)
12 pcs Steel plate (Dim: 2.50x1.20x0.05m each)
5 pcs Water pump
|