PETRO-CHEMICAL PLANT PROJECT

Project name : SM2 Project (Phase II)
Year : 2002
Location : Merak, Indonesia
Equipment supplied : 2 units 6 axlelines Goldhofer trailer
  1 unit 6 axlelines Goldhofer self propelled trailer
  Jacking tools and equipments
Cargoes

: 1 unit old heat exchanger ( 180 w.tons)

  Dim: L9.00m x W5.00m x H6.50m
: 1 unit new heat exchanger ( 270 w.tons)

  Dim: L 27.30m x W4.05m x H4.17m

Duration : 10 April 2002 – 10 July 2002




This operation took place in Merak, Indonesia and it involved the transportation and exchange of the old heat exchanger with a new one by skidding. The project utilises 2 units 6 axlelines Goldhofer trailer ,1 unit 6 axlelines self propelled trailer and jacking tools.



Moving through Merak petro chemical plant in Indonesia.
Negotiating a narrow turn in the Chemical plant which makes the self propelled stands out. The Goldhofer trailer is used often because of its power, movement and self jacking system thus making it a main component in our operations.

Shown is the various steps involved in the skidding of the 180 Tons old heat exchanger measuring 9.0 x 5.0 x 6.5m.


Lifting of the old and new heat exchanger at the petro chemical plant.
Old heat exchanger (9.0m x 5.0m x 6.5m)

New heat exchanger (27.3 x 4.05 x 4.17m) lifted by our 500 Tons Demag CC2600 Crawler crane.



Using skidding method for installation of the new heat exchanger.