POWER STATION

Project name : Senoko Power Station Project (CCP 4 & CCP5)
Year : 2003
Location : SINGAPORE
Equipment supplied : 2 units 15 axlelines Goldhofer trailer
  1 unit 15 axlelines self propelled trailer
  1 unit 12 axlelines side by side Goldhofer trailer
  1 unit 12 axlelines (1+12 module) Goldhofer trailer
  2 units Goldhofer trailer
  1 unit forklift (3.5tons)
  Support Beam, cross beams & lashing
Cargoes description

: 2 units 375 tons gas turbine
  2 units 325 tons generator
  2 units 212 tons transformer
  2 units 130 tons HP drum
  2 units 72 tons steam turbine

  24 units 140 tons HRSG module






1 unit 375 Tons Gas Turbine discharge by vessel onto waiting
2 units 15 axlelines Goldhofer trailer.






Receiving of 375 Tons Thermal block from ocean vessel onto 15 axlelines (side-by-side) Goldhofer hydraulic Goldhofer trailer at Sembawang Port and land transport to site.






Receiving of 212 Tons Transformer on 15 axlelines Goldhofer trailer.






The picture shows the transportation of 140 Tons modules, by a 15 axlelines Goldhofer hydraulic trailer from Sembawang Port to Senoko Power Station.






The self-propel Goldhofer hydraulics trailer is use to transport the cargo through the narrow road leading to the entrance of Senoko Power Station.






The generator is to be installed in an enclosed area that the cranes is unable to access. Thus, the procedure of positioning had to be done by skidding.






Using the CLRG-1506 hydraulic jack to lift the 325 Tons Turbine to the required height.






The completion of the Senoko Power Station in August 2003 and the celebration of a new milestone in Phrase 2 Repowering.